Vision Statement for
Industrialization in Kandhamal District |
|
The vision for changing of Industrial
scenario in Kandhaml District shall be an integrated approach by capacity
building for development of Entrepreneurship for generating sustainable
employment to local people by making cLuSterization under msme sector
through optimum utilization of available local raw materials ( resources
like turmeric /POTATO /GROUND NUT /MANGO in agro based AND SIALI
LEAF IN FOREST BASED).
SHRI P.C.PANDE, OIS-I (INTER)GENERAL
MANAGER, DIC, PHULBANI
|
 |
|
C
O N T E N T S |
| 1 |
Introduction |
| II |
Objective of DIC |
| III |
Staffing
pattern |
| IV |
Staff
in position |
| V |
Bio-data
of Field Staff & Works assigned |
| VI |
Scheme
implemented through DIC, Phulbani |
| VII |
Different Policy/Act
implemented through DIC. |
| VIII |
Different Committee
Constituted for Industrial Development . |
| IX |
Role
of DIC, Phulbani & different scheme |
| X(A) |
Industrial
Scenario of Kandhamal District. |
| (B) |
Growth
of MSME in Kandhamal |
| XI |
Type of MSME units set up
2005-06 to 10-11 |
| XII |
Achievement of PMEGP 2008-09
to 10-11 |
| (A) |
Achievement of PMEGP (DIC) |
| (B) |
Achievement of PMEGP (KVIB) |
| XIII |
Achievement
of Handicraft Sector |
| XIV |
Identification of viable
Enterprises under MSME |
| XV |
List of Project identified by
KVIC for PMEGP |
| XVI |
Identification
of potential cluster |
| XVII |
Status
of Industrial Estate,
Phulbani |
| XVIII |
Action Plan for MSME 2011-12 |
| XIX |
Action Plan for PMEGP 2011-12 |
| XX |
Action Plan for Handicraft
2011-12 |
| XI |
Public
Information Cell under RTI Act |
| |
INTRODUCTION
District Industries Centre, Phulbani has been established during 1978 for Industrial development of Boudh – Kandhamal Districts. After separation of the Boudh District in 1994 , the area of operation of DIC,Phulbani now covers entire Revenue District of Kandhamal only .
II.OBJECTIVES
1.Promotion of Micro, Small & Medium Enterprises.
2.Implementation of Self-Employment Programme like PMEGP, Handicrafts.
3.DIC aims at to adopt a Professional approach, work pro actively, problem solving and create entrepreneurship at the field level so as to accelerate the process of Industrialization in the District.
4.DIC will act as a catalyst in the process of Industrialization so as to help the people to enjoy direct benefit in terms of employment, improved income level and multiplier effects.
III.STAFFING PATTERN.
DIC constituted a cutting edge field organization where General Manager, DIC is the first person with whom a Small Entrepreneurs interacts at root level .The present staffing pattern of DIC, Phulbani s given below.
| Sl
No |
Name of the post. |
Sanctioned strength. |
No.
in position |
Vacancy. |
Remarks |
| 1 |
2 |
3 |
4 |
5 |
|
| 1 |
General
Manager. |
1 |
1 |
- |
- |
| 2 |
Manager
(SS) |
- |
- |
- |
Post
has been shifted to other District. |
| 3 |
District
Cottage Industries Officer. |
- |
- |
- |
Post
has been shifted to other District. |
| 4 |
Asst. Manager |
2 |
- |
2 |
- |
| 5 |
Accountant. |
1 |
- |
1 |
- |
| 6 |
Industrial Supervisor. |
2 |
- |
2 |
- |
| 7 |
Economic Investigator. |
1 |
1 |
- |
- |
| 8 |
Industries
Promotion Officer . |
|
|
|
| a |
Regular |
7 |
4 |
3 |
|
| b |
Contractual |
2 |
2 |
- |
|
| 9 |
Sr.Steno. |
1 |
1 |
- |
|
| 10 |
Sr.Clerk. |
2 |
1 |
1 |
|
| 11 |
Jr.Clerk. |
1 |
1 |
- |
|
| 12 |
Jr.Steno. |
2 |
1 |
1 |
|
| 13 |
Driver. |
1 |
- |
1 |
Govt.Vehicle
not available |
| 14 |
Peons/Messengers. |
21 |
19 |
2 |
- |
|
Sub
Total. |
44 |
31 |
13 |
- |
| 15 |
OK&VIB Staff |
|
|
|
- |
| i |
Development Officer. |
1 |
- |
1 |
- |
| ii |
Supervisor, OK&VIB |
1 |
1 |
- |
Under
order of transfer |
| iii |
Beekeeping field man |
2 |
1 |
1 |
- |
| iv |
Jr.Asst. |
1 |
1 |
- |
- |
|
Sub Total. |
5 |
3 |
2 |
|
|
Grand Total. |
49 |
34 |
15 |
|
| |
|
|
|
|
|
BIO-DATA OF
FIELD STAFF & WORKS ASSIGNED ( AS ON 30.6.11)
| Sl
no |
Name |
Designation |
Category |
Scale
of pay |
Work
assigned |
HQrs.
fixed |
Contact
Number. |
| +GP |
| 1 |
Shri P.C.Pande, OIS-I
(Inter). |
General Manager, DIC |
A |
15600-39100 |
Overall responsible for
Industrial development of Kandhamal
district. |
DIC,
Phulbani |
06842-253239(O) |
| GP-6600 |
253279(Com) |
|
9437215011(M) |
|
| 2 |
Shri
N.R.Das, |
E.I. |
C |
9300-34800 |
MSME
Section |
DIC, |
9437069710 |
| GP-
4200 |
Phulbani |
| 3 |
Shri
M.K.Satpathy, |
IPO |
C |
9300-34800 |
IPO, Phulbani Block & Addl. H&CI
Section. |
DIC, |
9437412688 |
| GP-
4200 |
PIO under RTI Act. |
Phulbani |
| 4 |
Shri Susant Ku. Samal |
IPO |
C |
consolidated |
MSME OPDR |
DIC,
Phulbani |
9439254373 |
| Rs.9300/- |
IPO, Phulbani |
|
Municipality |
| 5 |
Shri
Rajesh Das |
IPO |
C |
Consolidated |
IPO,
Khajuripada |
DIC, |
9439572251 |
| Rs.9300/- |
Addl.
H&CISection |
Phulbani |
| 6 |
Shri
R.N.Panigrahi |
IPO |
C |
9300-34800 |
IPO,
Balliguda/Addl. IPO, Daringbadi |
Balliguda |
9437859435 |
| GP-4200 |
| 7 |
Shri
Debraj Sahoo |
IPO |
C |
9300-34800 |
IPO, Tikabali |
Tikabali |
9437018231 |
| GP-
4200 |
Addl.IPO,
Chakapad |
|
Addl. IPO, G.Udayagiri |
|
Addl.
IPO,Raikia |
| 8 |
Shri
R.C.Majhi, |
IPO |
C |
9300-34800 |
IPO, Phiringia |
Phiringia |
8895241988 |
| GP-4200 |
Addl. IPO,
K.Nuagaon |
| 9 |
Shri
S.C.jena, |
IPO |
C |
9300-34800 |
IPO, Tumudibahdh |
Tumudibanhdh |
9437765502 |
| GP-4200 |
Addl. IPO,
Kotagarh |
VI. SCHEME IMPLEMENTED THROUGH DIC, PHULBANI
1. Development of Micro, Small & Medium Enterprise (MSME).
2. Prime Minister Employment Generation Programme (PMEGP).
3. Development of Handicraft Sector
a. Rehabilitation of Handicraft Artisans
b. Promotion of Handicraft Entrepreneurs.
c. Craft Village Programme.
d. Skill Development Training under Master Crafts Man
e. Exhibition & Publicity.
f. Rajib Gandhi Shilpi Swasthya Bima Yojana (RGSSBY).
g. Janashree Bima Yojana (JBY).
VII. DIFFERENT POLICY/ACT IMPLEMENTED THROUGH DIC
1. Industrial Policy Resolution -2007
2. Odisha MSME Development Act -2009
3. Odisha Industrial Facilitation Act -2004 &
Industrial Facilitation Rules -2005
4. OPDR Act for recovery of PMRY loan
VIII. DIFFERENT COMMITTEE CONSTITUTED FOR INDUSTRIAL DEVELOPMENT
1. District Single Window Clearance Authority (DSWCA)
2. District Task Force on PMEGP (DTF)
3. District Shilpa Adalat (DSA)
4. District Level Coordination Committee on Handicrafts.
5. District Level Monitoring Committee on Handicrafts.
6. District Level Committee for Revival of Sick Units.
X. (A) INDUSTRIAL SCENARIO OF KANDHAMAL DISTRICT AS ON 30.06.11
1. Large Scale Industry - Nil
2. Medium Scale Enterprise. - Nil
3. Small Scale Enterprise shown as GIP since 1993-94. - 02
4. Micro Enterprises shown as GIP since 1993-94. - 1342
5. Micro / Small Scale Enterprises registered /EM-II with DIC since 1993-94 - 554
(B)Growth of MSME Sector in Kandhamal (1993-94 to 2010-11)
|
T
a
r g
e
t
|
A
c h
i E
v e m
e n
t |
| Sl
no |
Year |
PRC/EM-I |
PMT/EM-II |
GIP |
Investment(Rs.
In lac) |
Employment |
PRC/EM-I |
PMT/EM-II |
GIP |
Investment(Rs.
In lac) |
Employment |
| 1 |
1993-94 |
80 |
20 |
40 |
89 |
350 |
101 |
17 |
47 |
130.7 |
208 |
| 2 |
1994-95 |
80 |
20 |
40 |
89 |
350 |
53 |
29 |
53 |
48.9 |
173 |
| 3 |
1995-96 |
90 |
25 |
45 |
112.5 |
250 |
58 |
26 |
49 |
38.31 |
202 |
| 4 |
1996-97 |
120 |
30 |
60 |
180 |
360 |
93 |
35 |
70 |
68.84 |
226 |
| 5 |
1997-98 |
120 |
30 |
60 |
210 |
360 |
137 |
31 |
73 |
78.24 |
281 |
| 6 |
1998-99 |
130 |
30 |
60 |
210 |
360 |
130 |
31 |
66 |
161.46 |
258 |
| 7 |
1999-2k |
106 |
27 |
53 |
65 |
318 |
110 |
28 |
56 |
70.4 |
202 |
| 8 |
2000-01 |
120 |
30 |
60 |
300 |
360 |
130 |
31 |
62 |
114.41 |
231 |
| 9 |
2001-02 |
141 |
35 |
70 |
350 |
420 |
141 |
35 |
70 |
97.31 |
216 |
| 10 |
2002-03 |
142 |
35 |
70 |
350 |
350 |
142 |
35 |
74 |
91.47 |
230 |
| 11 |
2003-04 |
170 |
40 |
86 |
344 |
396 |
170 |
42 |
88 |
78.54 |
237 |
| 12 |
2004-05 |
176 |
40 |
90 |
346 |
436 |
190 |
41 |
92 |
166.69 |
437 |
| 13 |
2005-06 |
180 |
45 |
95 |
570 |
475 |
175 |
17 |
64 |
115.14 |
238 |
| 14 |
2006-07 |
180 |
45 |
95 |
570 |
475 |
65 |
17 |
64 |
110.11 |
235 |
| 15 |
2007-08 |
160 |
40 |
95 |
570 |
475 |
121 |
7 |
94 |
124.48 |
287 |
| 16 |
2008-09 |
160 |
40 |
95 |
570 |
475 |
163 |
41 |
96 |
210.31 |
258 |
| 17 |
2009-10 |
160 |
40 |
95 |
570 |
475 |
190 |
43 |
100 |
235.49 |
332 |
| 18 |
2010-11 |
160 |
40 |
95 |
570 |
475 |
172 |
43 |
103 |
451.49 |
372 |
| 19 |
2011-12
upto 30.6.11 |
170 |
45 |
105 |
840 |
525 |
35 |
5 |
23 |
56.13 |
77 |
|
Total |
2645 |
657 |
1409 |
6905.5 |
7685 |
2376 |
554 |
1344 |
2449.02 |
4700 |
| |
|
|
|
|
|
|
|
|
|
|
|
XI. TYPE OF MSME UNIT SET UP FROM 2005-06 TO 2010-11
| Sl No. |
Resources |
|
Project |
PRC/EM-I |
GIP |
PMT/EM-II |
| 1 |
Agriculture/Horticulture |
i |
Rice
Mill/Huller |
211 |
212 |
51 |
|
|
ii |
Dal mill |
1 |
|
|
|
|
iii |
Turmeric powder |
119 |
8 |
11 |
|
|
iv |
Spices grinding |
13 |
4 |
|
|
|
v |
Fruit
processing |
18 |
- |
- |
|
|
vi |
Cattle feed |
2 |
|
|
| 2 |
Food based |
i |
Bakery /jam
jelly |
23 |
5 |
2 |
|
|
ii |
Chocolate |
- |
1 |
|
|
|
iii |
Mixture
& namkin / papad |
19 |
8 |
4 |
|
|
iv |
Mudi /Chuda |
2 |
3 |
|
|
|
v |
Packaged water |
3 |
|
|
| 3 |
Forest based |
i |
Khali stitching |
76 |
16 |
10 |
|
|
ii |
Non
edible oil ( Mahua seeds/ Sal seeds) |
4 |
|
1 |
|
|
iii |
Triphala
churna / Herbal products |
2 |
|
1 |
|
|
iv |
Beekeeping |
2 |
|
|
|
|
v |
Bamboo craft |
1 |
|
|
|
|
vi |
Agarbati /
candle |
5 |
2 |
|
|
|
vii |
Ply wood
/Carpentry |
4 |
6 |
|
| 4 |
Tourism |
i |
Hotel /lodge |
2 |
1 |
|
| 5 |
Demand based |
|
|
|
|
|
| i |
Construction
materials |
i |
Stone crusher |
2 |
1 |
1 |
|
|
ii |
Cement tiles/ Cement products |
22 |
8 |
2 |
|
|
iii |
Fabrication unit ( steel ) |
76 |
33 |
22 |
|
|
iv |
Bricks |
5 |
1 |
- |
| ii |
House hold
articles |
i |
Aluminum
utensils |
3 |
|
1 |
|
|
ii |
Washing soap |
|
|
1 |
|
|
iii |
Phenyl mfg |
1 |
|
|
|
|
iv |
Mosquito coil |
1 |
|
|
|
|
v |
Dry cleaning |
2 |
|
|
| 6 |
Miscellaneous |
i |
Tyre retreading |
2 |
9 |
2 |
|
|
ii |
Automobile garage |
28 |
15 |
1 |
|
|
iii |
Mobile
repairing |
33 |
6 |
1 |
|
|
iv |
Readymade garments mfg |
45 |
44 |
12 |
|
|
v |
Offset printing press |
7 |
2 |
6 |
|
|
vi |
Distil water |
4 |
|
|
|
|
vii |
PSC pole |
2 |
1 |
1 |
|
|
viii |
Beauty parlour |
26 |
|
|
|
|
ix |
DTP/Cyber café/Xerox |
86 |
56 |
20 |
|
|
x |
Jewellery silver/gold mfg &
servicing |
10 |
6 |
4 |
|
|
Xi |
Repairing
of TV & Radio |
10 |
2 |
3 |
|
|
Xii |
Mfg.
of Bag/rexin /seat cover |
- |
8 |
1 |
|
|
Xiii |
Tent house |
2 |
2 |
3 |
|
|
Xiv |
Photo studio |
|
20 |
3 |
|
|
Xv |
Hiring
of sound system |
4 |
8 |
2 |
|
|
Xvi |
Book binding |
|
2 |
|
|
|
Xvii |
Electrical works |
1 |
8 |
|
|
|
Xviii |
Mfg. of shoe |
|
- |
1 |
|
|
Xix |
Tailoring |
|
22 |
1 |
|
|
XX |
Cold storage |
3 |
|
|
|
|
XXI |
x-ray |
1 |
|
|
|
|
XXII |
gymnasium centre |
1 |
|
|
|
|
XXIII |
Painting /Art |
2 |
1 |
|
|
|
|
Total |
886 |
521 |
168 |
| |
|
|
|
|
|
|
XII. ACHIEVEMENT OF PMEGP (DIC/KVIB) FROM 2008-09 – 2010-11.
| A. |
YEAR
WISE PERFORMANCE UNDER
PMEGP(DIC) 2010-11 AS ON 30.06.11 |
| Sl no |
Particular |
2008-09 |
2009-10 |
2010-11 |
2011-12 |
| 1 |
Target |
|
|
|
|
| a |
Physical |
14 |
14 |
18 |
16 |
| b |
Financial
(Rs. In lakh ) |
16.8 |
16.8 |
25.2 |
Rs.22,38,608/- |
| 2 |
Application received |
61 |
128 |
139 |
132 |
| 3 |
Application
selected |
25 |
29 |
30 |
|
| 4 |
Application sponsor |
|
|
|
|
| a |
Number |
18 |
19 |
22 |
|
| b |
Project
amount (Rs. In Lakh) |
142.037 |
150.49 |
141.565 |
|
| 5 |
Sanction |
|
|
|
|
| a |
Number |
13 |
15 |
18 |
|
| b |
Amount (Rs.in lakh) |
52.136 |
96.01 |
93.196 |
|
| 6 |
Disbursed |
|
|
|
|
| a |
Number |
12 |
15 |
18 |
|
| b |
Amount (Rs.in lakh) |
44.936 |
82.774 |
37.811 |
|
| 7 |
CGTMSE coverage |
5 |
10 |
15 |
|
| 8 |
No
of grounding |
11 |
12 |
9 |
|
| 9 |
Employment |
79 |
94 |
39 |
|
| |
|
|
|
|
|
ii)Financial achievement (Release of margin money).
| |
2008-09 |
2009-10 |
2010-11
( upto 10.6.11) |
|
Target |
Amount
released |
Target |
Amount |
Target |
MM
requirement |
MM
claimed |
MM
released. |
| Financial
(Rs. In Lakh) |
16.8 |
13.544 |
16.8 |
25.525 |
25.2 |
26.095 |
26.095 |
26.095 |
| Physical
Rs. In Lakh |
14 |
12 |
14 |
15 |
18 |
18 |
18 |
18 |
| |
|
|
|
|
|
|
|
|
vi)Category wise achievement.
| Year |
Particular |
SC |
ST |
OBC |
Gen. |
Total |
Women |
PH. |
MC |
| 08-Sep |
Target |
2 |
1 |
4 |
7 |
14 |
4 |
1 |
2 |
| Achievement |
1 |
5 |
2 |
2 |
10(D) |
2 |
- |
- |
| 09-Oct |
Target |
2 |
3 |
4 |
2 |
14 |
4 |
2 |
- |
| Achievement |
1 |
- |
3 |
5 |
09(D) |
- |
- |
- |
| 10-Nov |
Target |
3 |
3 |
5 |
11 |
22 |
7 |
2 |
1 |
| Achievement |
8 |
1 |
1 |
6 |
16(D) |
2 |
1 |
- |
| |
|
|
|
|
|
|
|
|
|
INFORMATION ON BENEFICIARIES WISE ACHIEVEMENT OF (DIC) PMEGP2008-09
| Sl
no |
Name
of bank |
Bio-data |
|
|
|
Sanction (Rs.in lakh) |
|
|
Disbursed
(Rs.in lakh) |
|
|
MM
released |
status |
|
|
Name
of the applicant |
Category |
Activity |
Project cost (Rs.in lakh) |
TL |
WC |
Total |
TL |
WC |
Total |
(Rs.in lakh) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
| 1 |
SBI,
Tikabali |
Dilip
Ku. Mohanty |
Gen |
Fabrication |
5 |
1.1 |
3.9 |
5 |
1.1 |
3.9 |
5 |
1.25 |
W |
| 2 |
SBI,
Linepada |
Prasanta
Ku. Nayak |
SC |
Photo
studio |
4.787 |
1.8 |
0.3 |
2.1 |
1.8 |
0.3 |
2.1 |
0.7 |
W |
| 3 |
SBI,
Sarangada |
Bholanath
Konhar |
ST |
Rice
huller |
5.02 |
1.25 |
1.25 |
2.5 |
1.25 |
1.25 |
2.5 |
0.875 |
W |
| 4 |
SBI,
Tumudibandh |
Netra
Manseth |
SC |
Leaf
plate & cup mfg. |
24.89 |
2.5 |
2.45 |
4.95 |
2.5 |
2.45 |
4.95 |
1.732 |
W |
| 5 |
SBI,
Khajuripada |
Saraj
Ku. Pradhan |
ST |
Tent
house |
5.02 |
1.5 |
0.5 |
2 |
1.5 |
0.5 |
2 |
0.7 |
W |
| 6 |
SBI,
Gutingia |
Kanchan
Pradhan |
ST |
Fabrication |
5 |
1 |
2.4 |
3.4 |
1 |
2.4 |
3.4 |
1.19 |
W |
| 7 |
SBI,
Phulbani |
Prabhat
ku. Mallick |
ST |
Rice
huller |
8.03 |
2 |
1 |
3 |
0.8 |
- |
0.8 |
1.05 |
Work shed could not be
completed |
| 8 |
UGB,
Tikabali |
Basant
Ku. Sahu |
Gen |
Fabrication |
5 |
0.9 |
3.9 |
4.8 |
0.9 |
3.9 |
4.8 |
1.2 |
W |
| 9 |
UGB,
Tikabali |
Jugal
Kishore Panda |
Gen |
Tent
house |
5.5 |
4.67 |
0.13 |
4.8 |
4.67 |
0.13 |
4.8 |
1.2 |
W |
| 10 |
UGB, Tikabali |
Nilanchal
Das |
Gen |
Photo
studio |
4.787 |
4.5 |
0.286 |
4.786 |
4.5 |
0.286 |
4.786 |
1.196 |
W |
| 11 |
UGB,
Tikabali |
Basant
Ku. Bhoi |
Gen |
Bakery |
5.897 |
2.62 |
2.18 |
4.8 |
2.62 |
2.18 |
4.8 |
1.2 |
W |
| 12 |
Allh.
Bank, Phulbani |
Satpriya
Sahu |
OBC |
Dhaba |
10.844 |
4 |
1 |
5 |
4 |
1 |
5 |
1.25 |
W |
| 13 |
UCO,
Phulbani |
Sanjib
Ku. Digal |
SC |
Chuda
Mill |
5 |
3.02 |
1.98 |
5 |
Applicant
refused to avail loan |
|
|
|
|
|
|
|
|
Total |
94.775 |
30.86 |
21.276 |
52.136 |
26.64 |
18.296 |
44.936 |
13.544 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
INFORMATION ON BENEFIFICAIRES WISE ACHIEVEMENT
OF(DIC) PMEGP 2009-10
| Sl
no |
Name
of bank |
Bio-data |
|
|
|
Sanction
(Rs.in lakh) |
|
Disbursed
(Rs.in lakh) |
|
MM
released |
status |
Employment |
Employment |
CGTMSE |
|
|
Name
of the applicant |
Category |
Activity |
Project cost (Rs.in
lakh) |
TL |
WC |
Total |
TL |
WC |
Total |
(Rs.in lakh) |
|
|
|
coverage |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
15 |
16 |
| 1 |
SBI,
Khajuripada |
Sunil Ku. Sahoo |
SEBC |
Mfg.
of Jewellery |
18.59 |
5.59 |
13 |
18.59 |
2.99 |
11.7 |
14.69 |
4.647 |
He has started
business unit in the premises of
PMRY unit of his brother |
|
7 |
Yes |
| 2 |
SBI,
Khajuripada |
Sukanta
Ku. Patnaik |
Gen. |
Fabrication |
15 |
5 |
10 |
15 |
3.4 |
11.3 |
14.7 |
3.75 |
W |
10 |
5 |
Yes |
| 3 |
SBI,
Tikabali |
Purna
Ch. Panda |
Gen. |
DTP,
screen printing , Xerox |
5 |
4.22 |
0.78 |
5 |
4.22 |
0.78 |
5 |
1.25 |
W |
5 |
5 |
- |
| 4 |
SBI,
Balliguda |
Abhimanyu
Panda |
Gen. |
Leaf
cup & plate making |
5 |
2 |
3 |
5 |
2 |
3 |
5 |
1.25 |
W |
14 |
15 |
Yes |
| 5 |
SBI,
Balliguda |
Naba
Ku. Panigrahi |
Gen |
Leaf cup &
plate making |
5 |
3.5 |
1.5 |
5 |
3.5 |
1.5 |
5 |
1.25 |
W |
7 |
7 |
Yes |
| 6 |
SBI,ADB,
K.Nuagaon |
Rajib
lochan Baxi |
SC |
Leaf cup &
plate making |
5 |
2.5 |
2.5 |
5 |
2.5 |
2 |
4.5 |
1.25 |
W |
20 |
3 |
Yes |
| 7 |
SBI,Linepada |
Sanuj
Ku. Dalabehera |
ST(W) |
Rice
Flour & turmeric |
3.5 |
2.7 |
0.8 |
3.5 |
2.7 |
- |
2.7 |
1.225 |
W |
4 |
|
|
| 8 |
SBI,
Paburia |
Pankajini
Konhar |
ST |
Leaf
cup & plate making |
5 |
1.01 |
3.99 |
5 |
1.01 |
0.049 |
1.059 |
1.75 |
W |
10 |
7 |
- |
| 9 |
SBI,
Phulbani |
Birupakshya
Bagh |
SC |
Tyre
retreading |
5 |
1.5 |
3.5 |
5 |
1.5 |
3.5 |
5 |
1.25 |
He
has not grounded the unit as per
sanction project. |
9 |
- |
| 10 |
SBI,
Phulbani |
Sunil
Ku. Behera |
OBC |
Light
& sound |
3 |
1.9 |
1.1 |
3 |
1.9 |
1.1 |
3 |
0.75 |
W |
6 |
5 |
- |
| 11 |
Allah.
Bank, Phulbani |
Prasanta
Ku. Sahu |
SC(W) |
Rice
, flour & turmeric |
5 |
4 |
1 |
5 |
3.326 |
1.674 |
5 |
1.25 |
W |
2 |
11 |
- |
| 12 |
PNB,
Phulbani |
Smt.
Rasmirekha Behera |
Gen(W) |
Mixture
making |
3.5 |
1.5 |
2 |
3.5 |
0.3 |
- |
0.3 |
0.875 |
Shed
could not complete |
5 |
- |
| 13 |
UCO, Phulbani |
T.Reeta
Patra |
ST(W) |
Flour &
turmeric grinding |
13.42 |
8.8 |
4.62 |
13.42 |
8.8 |
4.62 |
13.42 |
3.355 |
W |
10 |
79 |
|
| 14 |
UCO,Phiringia |
Smt.
Jayanti Konhar |
ST |
Chuda
Mill |
2 |
1.405 |
0.595 |
2 |
1.405 |
- |
1.405 |
0.7 |
W |
3 |
|
|
| 15 |
UCO,
Phiringia |
Umesh
Konhar |
ST |
Hiring
of sound system |
2 |
1.8 |
0.2 |
2 |
1.8 |
0.2 |
2 |
0.7 |
W |
3 |
|
|
|
|
|
|
Total |
96.01 |
47.425 |
48.585 |
96.01 |
41.351 |
41.423 |
82.774 |
25.252 |
12 |
94 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
INFORMATION ON BENEFIFICAIRES WISE ACHIEVEMENT OF(DIC)PMEGP2010-11.
| Sl
no |
Name
of bank |
Bio-data |
|
|
|
Sanction
(Rs.in lakh) |
|
Disbursed
(Rs.in lakh) |
|
MM
released |
status |
Employment |
CGTMSE |
|
|
|
Name
of the applicant |
Category |
Activity |
Project cost (Rs.in lakh) |
TL |
WC |
Total |
TL |
WC |
Total |
(Rs.in lakh) |
|
|
coverage |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
|
| 1 |
SBI,
Tikabali |
Pradeep
Ku. Ratha |
Gen. |
Leaf
cup & Plate making |
5 |
3.65 |
1.35 |
5 |
1.54 |
- |
2.7 |
1.75 |
Work
shed completed. machineries installed . production . Started. |
|
|
|
|
|
|
(PH) |
|
|
|
|
|
1.16 |
|
|
|
|
|
|
|
| 2 |
SBI
(ADB) K.Nuagaon |
Pratip
Ku. Pradhan |
ST |
Leaf
cup & plate making |
5 |
2.7 |
2.3 |
5 |
1.19 |
- |
2.03 |
1.75 |
work shed completed. Order
placed for Machiney.. |
|
|
|
|
|
|
|
|
|
|
|
|
0.84 |
|
|
|
|
|
|
|
| 3 |
SBI,
Sarangada |
Basudeb
Karna |
Gen. |
Dal
processing unit |
5 |
3.16 |
1.84 |
5 |
1.05 |
- |
1.05 |
1.25 |
Work
shed under
progress. |
|
| 4 |
SBI,
Daringbadi |
Smt.
Manarama Dehudi |
OBC |
Mfg.
of cement products |
10 |
2 |
2 |
4 |
2 |
2 |
4 |
1.4 |
W |
10 |
EM-II
issued. |
|
|
|
(W) |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 5 |
SBI,
Balliguda |
Pradeep
Ku. Dora |
Gen |
Leaf
cup & plate making |
10 |
3 |
2 |
5 |
0.5 |
- |
0.5 |
1.25 |
Work
shed not yet started |
|
|
| 6 |
sbi, Balliguda |
Krushna
Ch. Padhi |
Gen. |
Mfg.of
cement products |
7 |
2 |
3 |
5 |
1.39 |
- |
1.39 |
1.25 |
Work
shed under progress. |
|
| 7 |
SBI,
Tumudibandh |
Madanmohan
Mallick |
ST |
Tent
house |
6 |
2.6 |
0.4 |
3 |
2.43 |
- |
2.43 |
1.05 |
W |
8 |
EM-II |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
submitted |
|
| 8 |
SBI,Khajuripada |
Pramod
Ku. Sahu |
OBC |
Xerox,
mobile rep. & stickering |
5 |
3 |
2 |
5 |
2.62 |
- |
2.62 |
1.75 |
Work
shed not yet arrange. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Machinery
procured . |
|
|
| 9 |
UCO,
Phiringia |
Pradeep
Ku. Sahu |
SEBC |
Fabrication |
3 |
1.45 |
1.55 |
3 |
1.45 |
1.245 |
2.695 |
0.75 |
W |
3 |
EM-II
to be |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
submitted |
|
| 10 |
UCO,Gumagarh |
Kumari
Menaka Konhar |
ST (W) |
Rice mill |
5 |
1.85 |
1.15 |
3 |
0.937 |
- |
0.937 |
1.05 |
W |
3 |
EM-II to be |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
submitted |
|
| 11 |
UCO,
Phulbani |
Chitrasen
Patra |
SC |
Rice
huller |
5 |
3.4 |
1.6 |
5 |
0.895 |
- |
0.895 |
1.75 |
W |
3 |
EM-II to
be |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
submitted |
|
| 12 |
Union
Bank , Phulbani |
Bramhananda
Konhar |
ST |
Rice
& Chuda Mill |
5 |
2 |
1 |
3 |
2 |
1 |
3 |
1.05 |
W |
3 |
EM-II to
be |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
submitted |
|
| 13 |
Union
bank, Phulbani |
Manoj
Ku. Digal |
SC |
Mobile
repairing |
5 |
2 |
1 |
3 |
2 |
1 |
3 |
0.75 |
W |
2 |
EM-II to
be |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
submitted |
|
| 14 |
United
Bank, Phulbani |
Laxminarayan
Patnaik |
Gen |
Electronic
studio |
5 |
4.65 |
0.35 |
5 |
4.622 |
0.378 |
5 |
0.75 |
W |
4 |
EM-II
to be |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
submitted |
|
| 15 |
PNB ,Phulbani |
Kiran
Ku. Digal |
SC |
Mfg. of RMG |
3.5 |
2 |
1 |
3 |
0.4 |
- |
0.4 |
0.75 |
Work
shed is to be completed. |
|
| 16 |
Allah.
Bank, Phulbani |
Jitendra
Digal |
SC |
Mobile
repairing |
9.775 |
0.95 |
0.75 |
1.7 |
0.35 |
- |
0.35 |
0.425 |
Work
shed yet to be arranged |
|
| 17 |
Allah.
Bank, Phulbani |
Smt.
Sradha Mishra |
Gen (W) |
Mfg.
of steel furniture |
24.49 |
12.916 |
11.58 |
24.496 |
1.838 |
- |
1.838 |
6.13 |
Work
shed is under progress |
|
| 18 |
UCO,
phulbani |
Jagnyasen Behera |
SC |
Gents
parlour |
5 |
3 |
2 |
5 |
2.976 |
- |
2.976 |
1.25 |
W |
3 |
EM-II
to be submitted |
|
|
|
|
Total |
123.765 |
56.326 |
36.87 |
93.196 |
32.188 |
5.623 |
37.811 |
26.095 |
9 |
39 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B)YEAR WISE PERFORMANCE OF PMEGP (K&VIB) AS ON 30.6.11.
| Sl
no |
Particular |
2008-09 |
2009-10 |
2010-11 |
2011-12 |
| 1 |
Target |
|
|
|
|
| a |
Physical ( in number) |
14 |
14 |
22 |
21 |
| b |
Financial (Rs. In lakh) |
16.8 |
16.8 |
30.81 |
Rs.29.38
lac |
| 2 |
Application received |
20 |
58 |
115 |
98 |
| 3 |
Application
selected |
13 |
7 |
20 |
|
| 4 |
Application sponsor |
|
|
|
|
| a |
Number |
18 |
16 |
27 |
|
| b |
Project
amount (Rs.in lakh ) |
98.446 |
106.702 |
158.07 |
|
| 5 |
Sanction |
|
|
|
|
| a |
Number |
10 |
9 |
19 |
|
| b |
Amount (Rs.in lakh) |
35.854 |
45.47 |
69 |
|
| 6 |
Disbursed |
|
|
|
|
| a |
Number |
10 |
9 |
16 |
|
| b |
Amount (Rs.in lakh) |
32.604 |
39.3 |
24.319 |
|
| 7 |
Margin
money released |
|
|
|
|
| a |
Number |
10 |
9 |
16 |
|
| b |
Amount (Rs.in lakh) |
11.698 |
13.067 |
18.92 |
|
| 8 |
CGTMSE coverage |
8 |
8 |
9 |
|
| 9 |
No grounding |
9 |
9 |
4 |
|
| 10 |
Employment |
47 |
39 |
22 |
|
| |
|
|
|
|
|
v)Financial achievement (Release of margin money).
| |
2008-09 |
|
2009-10 |
|
2010-11 |
|
|
|
m.m.
to be released |
| |
Target |
Amount
released |
Target |
Amount |
Target |
MM
requirement |
MM
claimed |
MM
released. |
|
| Financial (Rs. In Lakh) |
16.8 |
11.698 |
16.8 |
13.067 |
30.81 |
18.92 |
18.92 |
18.92 |
Nil |
| |
|
|
|
|
|
|
|
|
|
| Physical (in Number) |
14 |
10 |
14 |
9 |
22 |
16 |
16 |
16 |
Nil |
| |
|
|
|
|
|
|
|
|
|
vi)Category wise achievement.
| Year |
Particular |
SC |
ST |
OBC |
Gen. |
Total |
Women |
PH. |
MC |
| 08-Sep |
Target |
2 |
1 |
4 |
7 |
14 |
4 |
1 |
2 |
| Achievement |
1 |
5 |
2 |
2 |
10(D) |
2 |
- |
- |
| 09-Oct |
Target |
2 |
3 |
4 |
2 |
14 |
4 |
2 |
- |
| Achievement |
1 |
- |
3 |
5 |
09(D) |
- |
- |
- |
| 10-Nov |
Target |
3 |
3 |
5 |
11 |
22 |
7 |
2 |
1 |
| Achievement |
8 |
1 |
1 |
6 |
16(D) |
2 |
1 |
- |
INFORMATION ON BENEFIFICAIRES WISE ACHIEVEMENT OF (KVIB)PMEGP 2008-09
|
Sl no |
Name
of bank |
Bio-data |
|
|
|
Sanction
(Rs.in lakh) |
|
|
Disbursed
(Rs.in lakh) |
|
|
MM
released |
status |
Employment |
CGTMSE |
|
|
|
Name
of the applicant |
Category |
Activity |
Project
cost (Rs.in lakh) |
TL |
WC |
Total |
TL |
WC |
Total |
(Rs.in lakh) |
|
|
coverage |
|
1 |
SBI, Simanbadi |
Jasabanta
Pradhan |
ST |
Rice mill |
5.02 |
1.5 |
1.5 |
3 |
1.5 |
1.5 |
3 |
1.05 |
W |
5 |
Yes |
|
2 |
SBI, Daringbadi |
Sunil ku.
Bisimajhi |
ST |
DTP work |
5.1 |
4.31 |
0.79 |
5.1 |
4.31 |
0.79 |
5.1 |
1.785 |
W |
9 |
- |
|
3 |
SBI,Khajuripada |
Smt. K.Sahu |
Gen(W) |
Spices grinding |
5.84 |
2.4 |
0.6 |
3 |
1.5 |
0.5 |
2 |
0.7 |
W |
4 |
yes |
|
4 |
SBI,
Khajuripada |
Prakash Ch.
Nayak |
SC |
Photo studio |
4.723 |
2.5 |
0.5 |
3 |
2.5 |
0.5 |
3 |
1.05 |
W |
4 |
yes |
|
5 |
UCO, Phiringia |
Smt.
Subarna Konhar |
ST(W) |
Rice mill |
5.02 |
1.5 |
1.5 |
3 |
1.5 |
1.5 |
3 |
1.05 |
W |
5 |
Yes |
|
6 |
UCO, Phiringia |
Srikanta Konhar |
ST |
Rice mill |
5.02 |
1.5 |
1.5 |
3 |
1.5 |
1.5 |
3 |
1.05 |
W |
5 |
Yes |
|
7 |
UCO, Phiringia |
Dusmanta Konhar |
ST |
Rice mill |
5.02 |
1.5 |
1.5 |
3 |
1.5 |
1.5 |
3 |
1.05 |
W |
5 |
Yes |
|
8 |
UCo, Phiringia |
Brajabandhu
Sahu |
OBC |
Rice mill |
5.02 |
1.5 |
1.5 |
3 |
0.75 |
- |
0.75 |
1.05 |
Shed
could not complete |
|
|
|
9 |
UCO, Phulbani |
Sambaru Sahu |
OBC |
Rice mill |
4.754 |
2.142 |
2.612 |
4.754 |
2.142 |
2.612 |
4.754 |
1.663 |
W |
6 |
Yes |
|
10 |
UGB, Balliguda |
Niranjan Sahu |
Gen. |
Hiring
of sound system |
5 |
4.59 |
0.41 |
5 |
4.59 |
0.41 |
5 |
1.25 |
W |
4 |
- |
|
|
|
|
|
Total |
47.497 |
23.442 |
12.412 |
35.854 |
21.792 |
10.812 |
32.604 |
11.698 |
9 |
47 |
8 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
INFORMATION ON BENEFIFICAIRES WISE ACHIEVEMENT OF (KVIB)PMEGP 2009-10
| Sl
no |
Name
of bank |
Bio-data |
|
|
|
Sanction
(Rs.in lakh) |
|
Disbursed
(Rs.in lakh) |
MM
released |
status |
Employment |
CGTMSE |
|
|
Name of
the applicant |
Category |
Activity |
Project cost (Rs.in lakh) |
TL |
WC |
Total |
TL |
WC |
Total |
(Rs.in lakh) |
|
|
coverage |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
| 1 |
SBI, Balliguda |
Ratnakar Digal |
SC |
Rice, flour & turmeric |
5 |
3 |
2 |
5 |
3 |
2 |
5 |
1.75 |
W |
3 |
|
| 2 |
SBI, Simanbadi |
Bulu Sabat |
Gen. |
Rice, flour & turmeric |
5 |
3.5 |
1.5 |
5 |
3.5 |
1.5 |
5 |
1.25 |
W |
4 |
|
| 3 |
SBI (ADB),
K.Nuagaon |
Jaleswar Pujari |
OBC |
Rice,
flour & turmeric |
5 |
3 |
2 |
5 |
3 |
2 |
5 |
1.75 |
W |
6 |
|
| 4 |
SBI, Phulbani |
Kartikeswar
Nayak |
Gen. |
Fabrication |
7 |
2.5 |
4.5 |
7 |
2.5 |
4.5 |
7 |
1.75 |
W |
5 |
|
| 5 |
SBI (ADB), G.Udayagiri |
Arakhita Behera |
OBC |
Rice
,flour & turmeric |
5 |
3.6 |
1.4 |
5 |
3.6 |
1.4 |
2.175 |
1.75 |
W |
5 |
|
| 6 |
UCO, Raikia |
Jagadish Das |
Gen. |
Tent house |
4.8 |
4.67 |
0.13 |
4.8 |
4.67 |
0.13 |
4.8 |
1.2 |
W |
5 |
|
| 7 |
UCO,Raikia |
Jitendra Patra |
Gen. |
Rice,
flour & turmeric |
5 |
3.7 |
1.3 |
5 |
- |
- |
4.525 |
1.25 |
W |
5 |
|
| 8 |
UCO,Raikia |
Antaryami Pati |
Gen. |
Rice,
flour & Turmeric |
6.67 |
1.5 |
5.17 |
6.67 |
- |
- |
4.84 |
1.667 |
W |
3 |
|
| 9 |
UCO,Phiringia |
Manoj Ku. Karna |
OBC |
Repairing
of electronic appliance |
2 |
0.96 |
1.04 |
2 |
- |
- |
0.96 |
0.7 |
W |
3 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
INFORMATION ON BENEFIFICAIRES WISE ACHIEVEMENT OF (KVIB)PMEGP 2010-11
.
| Sl
no |
Name
of bank |
Bio-data |
|
|
|
Sanction
(Rs.in lakh) |
|
Disbursed
(Rs.in lakh) |
|
MM
released |
status |
Employment |
CGTMSE |
| |
|
Name
of the applicant |
Category |
Activity |
Project
cost (Rs.in lakh) |
TL |
WC |
Total |
TL |
WC |
Total |
(Rs.in lakh) |
|
|
coverage |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
| 1 |
SBI, Khajuripada |
Pratap
Ku. Sahu |
OBC |
Leaf
cup & plate making |
5 |
2.85 |
2.15 |
5 |
2.35 |
- |
2.35 |
1.75 |
machinery
procured . Working shed
under construction |
| 2 |
SBI, Tikabali |
Tapan
Konhar |
ST |
Modern
Dhaba |
8.7 |
1.8 |
1.8 |
3.6 |
0.05 |
- |
0.05 |
1.26 |
Not
yet started |
|
| 3 |
SBI,Tikabali |
Gopal
Nayak |
SC |
Fabrication |
5 |
1.1 |
3.9 |
5 |
1.04 |
1.5 |
2.54 |
1.75 |
W |
7 |
EM-II submitted |
| 4 |
SBI,Tikabali |
Debi
Prasad Ratha |
Gen |
Tent
house |
4.8 |
4.67 |
0.13 |
4.8 |
4.67 |
- |
4.67 |
1.2 |
W |
8 |
EM-II
submitted |
| 5 |
SBI,Linepada |
Subrat
Ku. Prusty |
Gen |
Tent
house |
5 |
4.85 |
0.15 |
5 |
- |
- |
- |
- |
Bank
withdrawn the sanction |
| |
|
|
(PH) |
|
|
|
|
|
|
|
|
|
|
|
|
| 6 |
SBI,
Linepada |
Naresh
Ku. Mukhi |
SC |
DTP, Screen printing ,&
Xerox |
3 |
2.2 |
0.8 |
3 |
- |
- |
- |
- |
Bank
withdrawn the sanction |
| 7 |
SBI,Sankarakhole |
Ganesh
Ku. Pradhan |
Gen. |
Auto
garage |
5 |
1.2 |
2.8 |
4 |
1.2 |
0.3 |
1.5 |
1 |
W |
4 |
EM-II to be submitted |
| 8 |
SBI,
Balliguda |
Debasis
Mallick |
ST |
Rice,
flour & turmeric |
7 |
1 |
1 |
2 |
1 |
- |
1 |
0.7 |
Work
shed completed .machinery under installation |
| 9 |
SBI, Balliguda |
Subrat
Ku. Majhi |
SC |
Rice,
flour & turmeric |
5 |
3 |
2 |
5 |
0.6 |
- |
0.6 |
1.75 |
work
shed yet to start |
|
| 10 |
SBI, Balliguda |
Padmanav
Nayak |
SC |
Mfg.of
cement products |
5 |
1 |
1.5 |
2.5 |
1 |
- |
1 |
0.875 |
promoter
is not staying in the home
since last 2 months. |
| 11 |
SBI, Balliguda |
Smt.
Anita Patnaik |
Gen (W) |
Mfg.
of Papad |
5 |
1 |
3 |
4 |
1 |
1.47 |
2.47 |
1.4 |
Shed
completed. Oder placed
for machineries . |
| 12 |
SBI,Simanbadi |
Samsan
Pradhan |
ST |
Leaf
, cup & plate making |
5 |
1 |
1 |
2 |
0.88 |
- |
0.88 |
0.7 |
machinery
installation under process/Work shed completed. |
| 13 |
SBI(ADB),G.Udayagiri |
Manoj
Ku. Sahu |
Gen |
Fabrication |
5 |
1.1 |
3.9 |
5 |
1 |
- |
1 |
1.25 |
Machinery
installed /work shed under progress. . |
| 14 |
SBI,
Katingia |
Siba
Prasad Pradhan |
OBC |
Mfg.
Leaf cup & plate |
3.3 |
1.95 |
1.35 |
3.3 |
1.95 |
- |
1.95 |
1.155 |
order
placed for machinery . |
| 15 |
SBI,
Gadapaur |
Rajanikanta
Nayak |
SC |
Fabrication |
12 |
2.075 |
1.425 |
3.5 |
1.585 |
- |
1.585 |
1.225 |
Machinery
under installation . |
| 16 |
SBI,
Kotagarh |
Smt.
Jyoshnamayee Sahu |
Gen(W) |
Leaf
cup & plate making |
5 |
1.1 |
1.2 |
2.3 |
1 |
0.2 |
1.2 |
0.805 |
work
shed completed. Machinery installed.. |
| 17 |
UCO,
Phiringia |
Baikunthanath
Digal |
SC |
Art
& Craft , studio |
3 |
1.5 |
1.5 |
3 |
- |
- |
- |
- |
applicant
did not turn up to bank
for availing loan |
| 18 |
UCO,
Phiringia |
Sridhar
Digal |
SC |
Rice
& Flour |
3 |
1.45 |
1.55 |
3 |
1.45 |
0.03 |
1.48 |
1.05 |
order
for machinery has been placed. |
| 19 |
PNB,
Daringbadi |
Binod
Ku. Nayak |
SC |
Motor
garage |
5 |
2 |
1 |
3 |
1.744 |
- |
1.744 |
1.05 |
W |
3 |
EM-II
submitted |
| |
|
|
|
Total |
99.8 |
36.845 |
32.155 |
69 |
22.519 |
3.5 |
26.019 |
18.92 |
|
22 |
9 |
XIII.ACHIEVEMENT OF HANDICRAFT SECTOR IN KANDHAMAL DISTRICT
The artisans of Kandhamal are practicing the following crafts .
1.Applique
2.Bamboo Craft
3.Wood craft.
4.Dhokracasting.
5.Tribal jewellery
6.Terracotta
a. HANDICRAFT CLUSTER
| Sl no |
Location
of cluster |
Name
of Craft |
| 1 |
Sudrukumpa |
Bamboo Craft |
| 2 |
Ganjuguda/Keredi |
Terracotta
/Pottery |
| 3 |
Phulbani
/G.Udayagiri/Balliguda |
Appliqué. |
| 4 |
Phiringia |
Wood Craft |
| 5 |
Junagaon |
Terracotta /Pottery |
| 6 |
Barakhama |
Dhokra casting |
| 7 |
Barakhama /Melsikia |
Tribal Jewelers |
| 8 |
Tandipanga |
Bamboo Craft |
| 9 |
Nuapadar |
Bamboo Craft |
| 10 |
Padangi/Gudripadi |
Terracotta/Pottery |
| 11 |
Gutingia /Padangi |
Bamboo Crafts. |
| |
|
|
b.REHABILITATION OF HANDICRAFT ARTISANS
| Year |
Target |
Achievement |
Margin
Money subsidy |
Remarks |
| 2008-09 |
5 |
6 |
0.25 |
|
| 2009-10 |
10 |
28 |
0.43 |
|
| 2010-11 |
34 |
24 |
0.64 |
|
| 2011-12 |
35 |
13 |
|
|
| |
(Proposal) |
(ST sponsored ) |
|
|
c.PROMOTION OF HANDICRAFT ENTERPRISES
| Year |
Target |
Achievement |
Margin
Money subsidy |
| 2008-09 |
3 |
3 |
0.225 |
| 2009-10 |
2 |
2 |
0.15 |
| 2010-11 |
6 |
3 |
0.18 |
| |
|
|
|
d.SKILL DEVELOPMENT TRAINING UNDER MCM
| Sl no |
Craft |
Period |
Location |
Category
of artisan |
No.of
artisan covered |
Total
outlay(In Lakh) |
Status
of training Prog. |
| 1 |
Applique |
06.10.09 |
Phulbani |
ST(W) |
30 |
2.58 |
completed |
|
|
to |
|
|
|
|
|
|
|
05.07.10 |
|
|
|
|
|
| 2 |
Applique |
16.08.10 |
SAMANWITA, |
SC(W) |
15 |
0.9 |
completed |
|
|
to |
G.Udayagiri |
|
|
|
|
|
|
15.02.11 |
|
|
|
|
|
| 3 |
Applique |
10.01.11 |
Banabasi Sevasamiti, Balliguda |
ST(W) |
15 |
0.9 |
under |
|
|
to |
|
|
|
|
progress |
| |
|
09.07.11 |
|
|
|
|
|
1.23 nos.of ST (W) have been financed through SBI, Phulbani under RHA/DRI.
2.15 nos of SC (W) have been financed through SBI (ADB), G.Udayagiri under RHA/DRI.
3.13 nos of ST (W) Application have been sponsored to SBI, Balliguda.
e.CRAFT VILLAGE SCHEME.
| Sl
no |
Craft |
Starting
period |
Location |
Category |
No.of
artisan |
Total
outlay(in Lakh) |
Date
of completion |
| 1 |
Terracotta |
26.10.10 |
Keredi |
OBC |
15 |
1.03 |
6.6.11 |
| 2 |
Terracotta |
26.10.10 |
Ganjuguda |
OBC |
15 |
1.03 |
17.5.11 |
| 3 |
Dhokracasting |
25.10.10 |
Barakhama |
SC |
30 |
2.24 |
|
| |
|
|
|
|
|
|
|
f.EXPOSURE VISIT
16 nos of ST (W) & 13 SC (W) Artisans under Applique Trade has participated in exposure visit to Pipili , Puri & Konark . An amount of Rs. 46,600/- has been spent.
g.EXHIBITION
| Name of
exhibition |
Year |
Period |
|
No.of
artisan participated |
Total
sale |
Remarks |
| |
|
From |
To |
|
(Rs.in lakh) |
|
| Pustak
Mela, Phulbani |
2008-09 |
27.02.09 |
06.03.09 |
12 |
1 |
Keonjhar/Kalahandi |
|
|
|
|
|
|
/Sonepur/Kandhamal
Dist. |
| Pustak
Mela, Phulbani |
2009-10 |
24.02.10 |
03.03.10 |
22 |
2.53 |
Keonjhar/Puri/ |
|
|
|
|
|
|
Ganjam/Kalahandi/ |
|
|
|
|
|
|
Sonepur/Kandhamal
Dist. |
| Pustak
Mela, Phulbani |
2010-11 |
25.02.11 |
04.03.11 |
20 |
0.7824 |
Keonjhar/Kandhamal |
| |
|
|
|
|
|
Dist. |
h.WELFARE SCHEME OF ARTISANS
i. Issue of Identify Card 2009-10 - 113
Proposal submitted 2010-11 - 15
ii. Issue of Rajeev Gandhi 2009-10 - 113
Swasthya Shilpi Bima Yojana
iii.Issue of Janashree Bima Yojana 2010-11 - 33
iv.Scholarship 2010-11 - 01
XIV.IDENTIFICATION OF VIABLE ENTERPRISES UNDDER MSME
Considering the Potential /Resource/Demand of the district following category of projects have been identified under Micro/Small Enterprises.
A.RESOURCE BASED.
| Sl
no |
Proposed
project |
Sl
no |
Proposed
project |
| 1 |
Agro
based. |
2 |
House
hold Articles.
|
|
Rice
Mill |
|
Aluminum utensils. |
|
Dal mill |
|
Washing soap. |
|
Turmeric powder |
|
Detergent
powder. |
|
Ginger Powder |
|
Phenyl mfg. |
|
Spices grinding |
|
Mosquito coil. |
|
Arrowroot powder/Ragi |
|
Dry cleaning . |
|
Maize processing unit. |
|
|
|
Food
processing. |
|
|
|
Cattle feed |
|
|
|
Mango processing. |
|
|
|
Potato chips |
|
|
|
Ground nut decorticator |
|
|
|
Ground nut seeds processing plant. |
3 |
Food
based. |
|
|
|
Bakery/Ice Cream/Chocolate. |
|
|
|
Mixture & namkin/papad/Vermicelli |
|
|
|
Mudi
chuda/ Packaged water. |
|
|
|
Chhatua mfg. |
| 4 |
Forest
based. |
5 |
Mineral
based. |
|
Khalli stitching |
|
|
|
Non Edible oil( mahua seed/sal seed) |
|
Nil.(70%
area of the Dist. covers under Forest) |
|
Triphala churna/Herbal product. |
|
|
|
Beekeeping/Bamboo craft. |
|
|
|
Broom binding./Agarbati. |
|
|
|
Tamarind powder/concentrate |
|
|
|
Gum /Agarbati stick/Toothpicks |
|
|
|
Jackfruit processing. |
6 |
Tourism |
|
|
|
Hotel/
Tourism related industries |
| B) |
Demand
based. |
|
|
| 1 |
Construction
materials. |
2 |
Miscellaneous. |
|
Stone crusher. |
|
Tyre retreading/ Automobile garage. |
|
Hume pipe. |
|
Mobile
repairing/ Colour Photo laboratory/ Readymade garments. |
|
Cement tile |
|
Offset
printing press. |
|
Cement products. |
|
Distill
water. / PSC pole |
|
Fabrication
Unit |
|
Transformer repairing |
|
Chimini bricks |
|
IT KIOSK |
|
|
|
Cold storage |
| |
|
|
|
XV.LIST OF PROJECT FOR PMEGP IDENTIFIED BY KVIC.
Agro Based Food Processing Industry Total No. of Projects - 58
Forest Based Industry Total No. of Projects – 27
Polymer & chemical based Industry TotalNo. of Projects – 28
(GO
BACK) (GO
TOP)
|